LadderBlock Frame Block being lifted from the trailer to be set into place.
Each precision LadderBlock is lifted and bolted in place.
A typical erection crew averaged 14 minutes to lift, place and bolt each framing block.
One option is to set the LadderBlock below grade on piers.
The Half Spacer Top is typically used to cap-off the top of a frame.
Full Spacers may be used for lateral support.
Note the absence of shoring, scaffolding, or the usual construction clutter.
LadderBlock goes up straight and strong.
On average Sculpted Floor Blocks can be lifted and set in place every 5 minutes.
The Sculpted Floor Block can be set into place as LadderBlock framing does.
This final Frame Block is set in place finishing the framing of 16, 440 sq. feet
The finished building, Reunion Square.